SKU
EV-056
Spec
Dry ice, 40 kg/hr
Unit
PCS
In stock
22
Share:

Low Fog / Dry Ice Machine

Be the first to review1 views0 quoted
In StockNewRentalPurchaseDubai & UAE

Hire low fog / dry ice machine in Dubai and across the UAE — Dry ice, 40 kg/hr, 22 pcs in stock, delivery, installation and purchase options from Mahraj.

  • Specification: Dry ice, 40 kg/hr
  • Output: Up to 40 kg/hr
  • Tank: Heated water, 12 L
  • 22 pcs in the UAE inventory
  • Rental, installation and purchase options
  • Delivery across Dubai, Abu Dhabi, Sharjah and the Northern Emirates

Request a Quote

Price on request • Reply within 1 business day

Min. order: 1 PCS
Lead time: Same / next day
WhatsAppCall
Delivery across all 7 Emirates
Inspected & safety-compliant
Installation crews available

Low Fog / Dry Ice Machine — overview for event planners in Dubai and the UAE

When an event brief calls for Low Fog / Dry Ice Machine, the Low Fog / Dry Ice Machine is the configuration most planners end up specifying. Use it to sanity-check a layout, brief a technical supplier, or prepare a like-for-like comparison against another quote.

Mahraj supplies Low Fog / Dry Ice Machine as part of a broader event and site-equipment catalogue that also covers scaffolding, temporary fencing, crowd barriers and climate control. Keeping those lines under one supplier matters more than it sounds: it means one delivery schedule, one site contact and one method statement covering the whole build rather than four suppliers blaming each other.

The commercial position is straightforward. Every unit is quoted against the actual event — dates, venue, quantity and access — rather than a published price, because those four variables move the number more than the product itself. If the requirement is unusual, the specification is a starting point rather than a limit: most items can be configured or combined.

Low Fog / Dry Ice Machine specification

At Dry ice, 40 kg/hr, the unit sits in a size band that suits most mid-scale venue work in the UAE. Our crews work to output of Up to 40 kg/hr, tank of Heated water, 12 L, control of DMX / manual; the supporting details, power of 3000 W, ice of Dry ice supplied separately, effect of Ground-hugging fog, are confirmed at the technical review stage.

Recorded specification: Output Up to 40 kg/hr; Tank Heated water, 12 L; Control DMX / manual; Power 3000 W; Ice Dry ice supplied separately; Effect Ground-hugging fog. Where a figure depends on configuration — height settings, wall options, controller choice — the quotation states which variant is being supplied so there is no ambiguity at handover.

If your requirement sits outside those figures, say so early. Many lines can be supplied in a neighbouring size, a different finish or a heavier rating, and it is far cheaper to adjust the specification than to work around a unit that does not quite fit.

Build quality, materials and finish

A dry-ice low-fog machine that produces a heavy ground-hugging blanket, with a heated water tank and DMX output control.

Because the unit is hired repeatedly rather than installed once, the parts that wear are the parts that get attention: joints, pins, skins, castors and connectors. Those are checked between hires and replaced on a schedule rather than when they fail.

Finish is consistent across the fleet, which matters when several units appear together in one photograph or one ballroom. Where a client needs a specific colour or branding, that is handled as a separate finishing conversation rather than a promise made at quotation stage.

Where Low Fog / Dry Ice Machine works best

We see this unit specified for wedding first dance, stage reveals, photo moments and award entrances. Each of those settings brings a different constraint — sightlines, floor loading, wind exposure or guest flow — and the layout should reflect it. Where several units are used together, keep spares of the small fittings — pins, clips, covers, cables — on site. It is cheap insurance against a single missing part halting a build.

Indoors, the constraint is usually ceiling height, floor protection and access. Outdoors, it is wind, surface and anchoring. The same unit can serve both, but the installation plan is not the same, and neither is the crew time.

For venues with heritage restrictions or delicate finishes, mention it at enquiry stage. Protection boards, non-marking feet and alternative fixing methods are normal parts of the job, not special requests.

Sizing, capacity and planning guidance

Before fixing a quantity, it helps to sketch the venue to scale and mark the access routes, exits and service positions. Access is the silent constraint. If trolleys cannot reach the position, or a lift is too small, the practical quantity drops regardless of what the drawing shows.

As a practical benchmark for Low Fog / Dry Ice Machine, we usually quote from a scaled layout rather than a square-metre rule of thumb. Send the plan and the guest number, and the quantity follows from the geometry instead of a guess.

Where the event runs across several rooms or zones, treat each zone as a separate requirement and then consolidate. Consolidation is where the savings are — in transport, in crew time and in the number of spares that have to be carried.

Delivery, installation and operation

Pre-heat takes 45 minutes; dry ice is ordered for delivery on the event day and handled with gloves only. Those timings assume clear access, a level surface and a crew that has built the item before. Installation is carried out to a method statement, with a supervisor on site for anything involving height, lifting or public access.

Our coverage runs from Dubai and Sharjah through Abu Dhabi, Al Ain, Ajman, Ras Al Khaimah, Fujairah and Umm Al Quwain. Route, tolls and access restrictions are priced into the transport line rather than absorbed silently.

For events with a technical producer, we are happy to work to their schedule and attend production meetings. For organisers running the build themselves, we supply the method statement and a handover briefing instead.

Safety, permits and compliance in the UAE

Safety planning should cover the failure modes that matter on site: wind loading outdoors, trip hazards from cabling, public access to moving or hot parts, and the competence of whoever operates the unit. Our crews carry method statements and test certificates where applicable.

The unit is hired with its operating limits documented. Exceeding them — extra load, extra wind exposure, unauthorised modification — voids both the warranty and the insurance position, and is the most common cause of avoidable damage.

Insurance, method statements and equipment certificates are available for venue submissions. Give us the venue's supplier requirements early — some hotels and government venues ask for documents that take a few days to produce.

Rental, purchase, care and storage

Rental includes delivery within Dubai and Sharjah as standard, with Abu Dhabi, Al Ain and the Northern Emirates quoted by route. Installation and operator charges are shown separately so the comparison is honest.

Drain and dry the tank after use, descale monthly and never seal the tank while hot. Where a unit is purchased outright, we supply a simple service schedule with the delivery paperwork.

Where the unit is stored between events, keep it off the floor, out of direct sun and away from sand. A pallet and a cover cost very little and prevent most of the damage we see on returned stock.

Site notes our crews wish clients knew earlier

Loading bays and service lifts set the practical size limit far more often than the drawing does. For Low Fog / Dry Ice Machine, confirm the door width, the lift internal dimensions and whether trolleys are allowed through the lobby — hotels in particular have rules that are not on the plan.

Power and water are the other two recurring surprises. Anything that heats, cools, pumps or lights needs a supply position within reach, and a venue that cannot provide one needs a generator or a longer cable route quoted in advance.

Finally, give the venue a copy of the build schedule. Security desks, valet teams and facility managers can smooth an installation considerably when they know what is arriving, when, and how long it will stay.

Specification choices and alternatives

Not every brief lands exactly on Low Fog / Dry Ice Machine. The usual alternatives are a neighbouring size (a 3 m unit becomes 5 m, a 12 m span becomes 15 m), a heavier rating where wind or load is the constraint, or a different finish where the unit will be photographed.

Where the requirement is driven by a venue rule rather than a design choice — ceiling height, floor loading, fire rating, means of escape — tell us the rule and we will match the unit to it. Chasing a dimension without the underlying constraint tends to produce a specification that satisfies the drawing and fails the inspection.

Mixing lines is often the most economical answer. A smaller primary unit with two secondary ones frequently costs less than one oversized item, and it gives the event team more layout freedom on the day.

Ordering Low Fog / Dry Ice Machine — what to send for a quote

Quotations are issued with a clear validity period and itemised lines for hire, transport, installation and any operator requirement, so procurement can compare like with like.

To price {lower} accurately we need the event dates, venue and emirate, quantity, and the access arrangements at the loading bay. Photographs of the site are genuinely useful, especially for outdoor builds.

Once the dates are held, we confirm stock, book the crew and issue a build sheet. That document becomes the reference for delivery, installation and collection, and it is the reason repeat events run smoothly.

Frequently Quoted Together

Low Fog / Dry Ice Machine
In Stock · PCS