Power Distribution Board 63 A
Hire power distribution board 63 a in Dubai and across the UAE — 63 A, 12 outlets, 70 pcs in stock, delivery, installation and purchase options from Mahraj.
- Specification: 63 A, 12 outlets
- Input: 63 A 3-phase cam-lock
- Outlets: 12 × 16 A
- 70 pcs in the UAE inventory
- Rental, installation and purchase options
- Delivery across Dubai, Abu Dhabi, Sharjah and the Northern Emirates
Request a Quote
Price on request • Reply within 1 business day
Power Distribution Board 63 A — overview for event planners in Dubai and the UAE
Power Distribution Board 63 A is supplied from our Dubai depot as part of the wider event power & rigging range, with delivery and installation crews available across the UAE. The page below sets out the recorded specification, the practical planning figures, and the questions worth answering before a quotation is issued.
Mahraj supplies Power Distribution Board 63 A as part of a broader event and site-equipment catalogue that also covers scaffolding, temporary fencing, crowd barriers and climate control. Keeping those lines under one supplier matters more than it sounds: it means one delivery schedule, one site contact and one method statement covering the whole build rather than four suppliers blaming each other.
The commercial position is straightforward. Every unit is quoted against the actual event — dates, venue, quantity and access — rather than a published price, because those four variables move the number more than the product itself. Everything here is based on the unit we actually hold: dimensions, materials, power requirements and the handling notes our crews work to.
Power Distribution Board 63 A specification
The unit is listed as 63 A, 12 outlets and is priced and delivered per pcs. Transport planning starts with input of 63 A 3-phase cam-lock, outlets of 12 × 16 A, protection of 30 mA RCD + MCBs, while metering of Voltage / current, case of Road case, ip of IP44 determines how the unit is installed and what else has to be booked alongside it.
Recorded specification: Input 63 A 3-phase cam-lock; Outlets 12 × 16 A; Protection 30 mA RCD + MCBs; Metering Voltage / current; Case Road case; IP IP44. Where a figure depends on configuration — height settings, wall options, controller choice — the quotation states which variant is being supplied so there is no ambiguity at handover.
If your requirement sits outside those figures, say so early. Many lines can be supplied in a neighbouring size, a different finish or a heavier rating, and it is far cheaper to adjust the specification than to work around a unit that does not quite fit.
Build quality, materials and finish
A 63 A three-phase distribution board with RCD protection, 12 MCB outlets and cam-lock input, housed in a road case.
Because the unit is hired repeatedly rather than installed once, the parts that wear are the parts that get attention: joints, pins, skins, castors and connectors. Those are checked between hires and replaced on a schedule rather than when they fail.
Finish is consistent across the fleet, which matters when several units appear together in one photograph or one ballroom. Where a client needs a specific colour or branding, that is handled as a separate finishing conversation rather than a promise made at quotation stage.
Where Power Distribution Board 63 A works best
In our hire book this item most often appears at stage power distribution, lighting and AV feeds, exhibition stands and catering points. It is equally at home indoors and under cover, provided the surface and access are suitable. Think about the whole event day, not just the peak moment. Setup, doors, interval and breakdown each put different demands on the item, and the specification should survive all four.
Indoors, the constraint is usually ceiling height, floor protection and access. Outdoors, it is wind, surface and anchoring. The same unit can serve both, but the installation plan is not the same, and neither is the crew time.
For venues with heritage restrictions or delicate finishes, mention it at enquiry stage. Protection boards, non-marking feet and alternative fixing methods are normal parts of the job, not special requests.
Sizing, capacity and planning guidance
There is no single correct quantity for this unit; the right number depends on sightlines, guest flow and how long the event runs. Where the unit is used outdoors, wind exposure and surface conditions become part of the sizing calculation. Ballast, anchoring and the ability to strike quickly all affect how much can be installed.
As a practical benchmark for Power Distribution Board 63 A, we usually quote from a scaled layout rather than a square-metre rule of thumb. Send the plan and the guest number, and the quantity follows from the geometry instead of a guess.
Where the event runs across several rooms or zones, treat each zone as a separate requirement and then consolidate. Consolidation is where the savings are — in transport, in crew time and in the number of spares that have to be carried.
Delivery, installation and operation
Fed from the generator or house supply and earthed before any load is connected; circuits are labelled per department. The crew carries the standard tools and spares; anything venue-specific, such as a particular socket type, should be flagged in advance. Delivery windows matter more than distance in Dubai. A 20-minute drive can take an hour in peak traffic, so crews are booked around venue access slots rather than straight-line travel time.
Our coverage runs from Dubai and Sharjah through Abu Dhabi, Al Ain, Ajman, Ras Al Khaimah, Fujairah and Umm Al Quwain. Route, tolls and access restrictions are priced into the transport line rather than absorbed silently.
For events with a technical producer, we are happy to work to their schedule and attend production meetings. For organisers running the build themselves, we supply the method statement and a handover briefing instead.
Safety, permits and compliance in the UAE
Event equipment in the UAE falls under venue rules, Dubai Municipality requirements and, for structures and effects, Civil Defence approval. Power Distribution Board 63 A should be installed to the method statement supplied with the hire, and any structure above the venue's stated height limit needs sign-off before build.
Permits are venue and emirate-specific. Temporary structures, pyrotechnics, LPG and anything affecting means of escape usually need approval before installation, and the responsibility for that approval sits with the event organiser unless we agree otherwise in writing.
Insurance, method statements and equipment certificates are available for venue submissions. Give us the venue's supplier requirements early — some hotels and government venues ask for documents that take a few days to produce.
Rental, purchase, care and storage
The unit is available on daily, weekly and monthly terms, and for longer projects the rate is quoted against the event calendar rather than a list price. Purchase is also possible for organisers who run a regular programme and want their own stock.
RCD trip test before each event, case seals checked and cable glands re-tightened. Storage conditions matter as much as cleaning: dry, shaded, off the floor and away from sand ingress.
Where the unit is stored between events, keep it off the floor, out of direct sun and away from sand. A pallet and a cover cost very little and prevent most of the damage we see on returned stock.
Site notes our crews wish clients knew earlier
Loading bays and service lifts set the practical size limit far more often than the drawing does. For Power Distribution Board 63 A, confirm the door width, the lift internal dimensions and whether trolleys are allowed through the lobby — hotels in particular have rules that are not on the plan.
Power and water are the other two recurring surprises. Anything that heats, cools, pumps or lights needs a supply position within reach, and a venue that cannot provide one needs a generator or a longer cable route quoted in advance.
Finally, give the venue a copy of the build schedule. Security desks, valet teams and facility managers can smooth an installation considerably when they know what is arriving, when, and how long it will stay.
Specification choices and alternatives
Not every brief lands exactly on Power Distribution Board 63 A. The usual alternatives are a neighbouring size (a 3 m unit becomes 5 m, a 12 m span becomes 15 m), a heavier rating where wind or load is the constraint, or a different finish where the unit will be photographed.
Where the requirement is driven by a venue rule rather than a design choice — ceiling height, floor loading, fire rating, means of escape — tell us the rule and we will match the unit to it. Chasing a dimension without the underlying constraint tends to produce a specification that satisfies the drawing and fails the inspection.
Mixing lines is often the most economical answer. A smaller primary unit with two secondary ones frequently costs less than one oversized item, and it gives the event team more layout freedom on the day.
Ordering Power Distribution Board 63 A — what to send for a quote
Send a floor plan if you have one. A marked-up PDF is usually enough to confirm quantities and flag access problems before they become change orders.
If the brief is still forming, send what you have. A rough layout and a date range is enough to hold stock and give an indicative budget.
Once the dates are held, we confirm stock, book the crew and issue a build sheet. That document becomes the reference for delivery, installation and collection, and it is the reason repeat events run smoothly.
Related searches
Frequently Quoted Together




Related Products
View all in Cooling, Power & Lighting